A sample of Ben Pourbabai’s published work:
1.Pourbabai, B., J.P.C. Blanc, F.A. van der Duyn Schouten. (1996) Optimizing flow rates in a queueing network with side constraints, European Journal of Operational Research 88, 586-591.
2.Pourbabai, B., (1995), Loading Strategies for a Class of Just-in-Time Manufacturing Systems, 10, Int. J. of Advanced Manufacturing Technology, 46-51.
3.Pourbabai, B. and M. Pecht, (1994), Management of Design Activities in a Concurrent Engineering Environment, Int. J. of Production Research, 32, 4, 821-832.
4.Pourbabai, B., (1994), An Optimal Concurrent Design and Loading Strategy For Flexible Assembly Line System: To Control the Bottleneck, Int. J. of Advanced Manufacturing Technology, 9, 156-165.
5.Pourbabai, B., (1994), Tandem Behaviour of a Finite Capacity G/M/1 Queueing System With Instantaneous Bernoulli Feedback: An Algorithm, Int. J. of Systems Science, 25, 12, 2297-2308.
6.Pourbabai, B., (1994), Design of a Flexible Assembly Line : To Control the Bottleneck, Int. J. of Computer Integrated Manufacturing Systems, 7,2, 122-133.
7.Pourbabai, B., (1994), An Optimal Policy for Controlling the Flow Time In An Assembly Line System, Optimization, 30, 177-189.
8.Pourbabai, B. (1993), An Operational Strategy For Throughput Maximization and Bottleneck Control In An Assembly Line System: By Selection of the Processing Rates, J. of Operational Research Society, 44, 10, 1003-1011.
9.Pourbabai, B., (1993), Optimal Strategies for Design and Operation of a Flexible Manufacturing System, Engineering Optimization.
10.Pourbabai. B., (1993), Operating a Flexible Assembly Line: To Control the Bottleneck, E. J. of Operational Research, 71, 353-364.